THYSSENKRUPP
TESTTURM
MULTI

Expertise in installation of
innovative elevator concepts
like the first vertically and
horizontally moving elevator

INSTALLATION
ASSEMBLY
MODERNIZATION

of elevators and escalators

 

BERLIN

TV TOWER

Specialised in installations
of highrise elevators

 

RENZO PIANO

INTESA

SANPAOLO

Flexible and innovative
for modern architecture

Simplex founders - Ivan, Marina i Sinisa Stanic

10 SUCCESSFUL YEARS OF SIMPLEX

The first installed MULTI elevator in the world, more than 1100 installations in nearly 20 countries worldwide, modernization of lifts in the highest German construction, installation of elevators in the world's five largest cruisers - these are just some of the achievements of Simplex in 10 years of existence. In the new production hall Simplex celebrated first big anniversary in the circle of its business partners, representatives of Brodsko-Posavska County and many guests.

The story of Simplex started in 2008 as a result of Stanić's entrepreneurial idea. Sinisa and Ivan Stanic have gained valuable experience in the upgrading of elevators of all important manufacturers. Their sister Marina Stanic Pavlovic has been in the team since the very beginning and she has given contribution to the most demanding start-up years in the contracting and project realization sector. The first big project company realized in 2008 in Italy with just 10 employees, a branch office in Germany was established in the same year and the company's primary market was Western Europe, especially Germany, where SImplex now installing lifts in 7 construction sites. From a small family business whose goal was to build up the elevator mounting sector, Simplex is today a company with hundreds of employees who has become synonymous for quality and expertise in installing, installing and modernizing elevators and mobile staircases.

Among the company's associates today are the world's largest manufacturers of elevators such as: German ThyssenKruup, American Otis, Swiss Schindler and Finnish Kone and Simplex's workers are present at construction sites in the UK, Germany, France and Italy. Through its constant investing in employee training and obtaining quality certification, the company profiled in the "High rise" elevators, advanced elevator systems and responded to the demands of innovative architecture at renowned architects such as Renzo Piano, Kohn Pedersen Fox and Richard Meier & Partners Architects and at the German shipyard Meyer Werft in Papenburg, currently installing lifts on one of the largest cruise lines in the world, "The Spectrum of the Seas" of Royal Caribbean. The company's remarkable success was achieved by co-operating with the German ThyssenKruup elevator manufacturer in 2017 in the installation the first MULTI elevator without vertical cranes that is moving vertically and horizontally.


"We insist that the job is managed responsibly and works in a safe manner, persists in the quality of the work and our business policy is recognized by our clients and become our brand. These principles - responsible, safe, quality and branded business are the vision of Simplex that we have today," said Simplex director Sinisa Stanic. Simplex that we are achieving today, " said Simplex director Sinisa Stanic. This year Sinisa won prestigious title of EY Entrepreneur of the Year in the category of "International Achievement". The company also received the "Zlatna bilanca" award in two categories, for the most successful entrepreneur in the Construction business, and the second prize in the category for the overall achievement of total business in 2014.

For the occation of 10 years company organized a tour of the production facility. Supply of machine park for production, total value over 16 and a half million kuna, enabled the implementation of two EU projects "Lift without borders" and "E-impulse". The acquired machines have the highest degree of automation and meet the world's technological standards and the company's business strategy is to create new jobs accordnig with the increase of production in Slavonski Brod. 

NEW PROJECT - TRADING CENTER MEISTERMEILE, OFFAKAMP 9B / 11B, 22529 HAMBURG

Assembly managing and installation, 2018

City of Hamburg started with the new project, a Meistermeile business center in Offakamp in 2018. Simplex participates with the installation of 6 elevators with performance and loads of 2000 to 11,000 kg. With a an area of 11400 m2 for workshops and 2000 m2 for storage, the building will able to accommodate 70 small and medium-sized businesses for a cost-effective price. Large cargo lifts, sound insulation and reinforced floorboards will provide great conditions for entrepreneurs production. The Meistermeile Business Center with a good position and high quality space will be the perfect place to develop small and medium-sized companies.

6 elevators in total

  • 2 elevators with speed 0.65 m/s, 11000 kg load, 146 persons, 5 stations, 15,56 m
  • 2 elevators with speed 0.65 m/s, 6000 kg load, 58 persons, 5 stations, 15,56 m
  • 2 elevators with speed 1.00 m/s, 2000 kg load, 26 persons, 5 stations, 15,56 m

 

NEW PROJECT - ALTER WALL 10 – 32 , HAMBURG, GERMANY

Assembly managing and installation, 2018

Simplex is participating in the complete reconstruction and construction of the Alter Wall building 10-32 with the installation of 5 lifts. Alter Wall building is in the center of Hamburg, and at the end of the project it will be a combination of the building made up of the renovated historical facade and a modern center made of glass and steel. The facility consists of a shopping center of 12,000 square meters, office space of 18,000 and a museum of 3,000 square meters. In the future "Alter Wall Hamburg" is going to be a part of a new boulevard with promenades, offices, restaurants and museum along with five neighboring buildings dating from 1900. Works will be carried out by the Consortium of German companies led by designers "GMP - Gerkan Marg und Partner"

5 elevators in total

  • 2 elevators with speed 1.6 m/s, 1275 kg load, 11 persons, 11 stations, 43,55 m
  • 2 elevators with speed 1.6 m/s, 1275 kg load, 10 persons, 10 stations, 43,55 m
  • 1 elevator with speed 0.63 m/s, 4400 kg load, 58 persons, 3 stations, 11,31 m

 

NEW PROJECT - Engel & Völkers Headquarters, Hamburg, Germany

Assembly managing and installation, 2018

Simplex is installing 8 elevators with different performances ranging from 5 to 20 stations into a contemporary building located in HafenCity, the new urban district of Hamburg. It is an architectural solution of Richard Meier & Partners Architects, world-renowned authors of the famous Charles Street and Perry Street skyscrapers in New York, creators of more than 300 projects, 20 museums on 4 continents. The building of a unique design that meets the urban requirements of the HafenCity District still provides a new perspective on construction. The building consists of 7 floors for offices, 16 floors for apartments with 66 luxury and unique apartments and two penthouses. The entire floor will be the head office of Engel & Völkers.

8 elevators in total

  • 1 elevator with speed 1.6 m/s, 1000 kg load, 13 persons, 20 stations, 68 m
  • 2 elevators with speed 1.6 m/s, 800 kg load, 10 persons, 19 stations, 64 m
  • 2 elevators with speed 1.6 m/s, 1000 kg load, 13 persons, 11 stations, 35 m
  • 1 elevator with speed 0.5 m/s, 2500 kg load, 33 persons, 3 stations, 4.1 m
  • 1 elevator with speed 1.0 m/s, 1000 kg load, 13 persons, 13 stations, 38 m
  • 1 elevator with speed 1.0 m/s, 1250 kg load, 15 persons, 5 stations, 13 m

 

NEW PROJECT - commercial skyscraper "22 Bishopsgate", London, UK

Assembly managing and installation, 2018

A new Simplex project in the center of London. We are installing 4 "Mid-Rise" and 2 "Shuttle" elevators in one of the tallest business buildings in the 62-storey British capital, with a height of 278 meters, which also has the two highest lifts in Europe. After the construction and completion of the project, it will be the second tallest skyscraper in London with a work space for 12,000 people. The specialty of this building will be the installation of the first "climbing window" in the world where adventurous adrenaline fans will be able to climb into the skyscraper wall, 125 meters above ground, the project being developed by AXA IM Real Assets and Lipton Rogers Developments.

6 elevators in total:

  • 4 "Mid Rise" passenger elevators, 26 persons, 2000 kg, 5 m/s, 21 stations, height 109 m
  • 2 "Shuttle" elevators, 33 persons, 2250 kg, 8 m/s, 257 m

NEW PROJECT - "SPECTRUM OF THE SEAS" cruise ship
"MAYER WERFT" shipyard, Papenburg, Germany

Assembly managing and installation, 2018

14 elevators with 14 stations, Simplex is installing into one of the world's five largest cruisers, 348 meters long and has 4900 passengers, owned by Royal Caribbean. The first Ultra-class vessel was built in Rostock, Germany, and installation of the elevator takes place at the Meyer Werft shipyard in Papenburg. For Simplex, it is a special challenge to install elevators during the construction. First Quantum Ultra class cruise ship, Spectrum of the Seas is designed specifically for the Chinese market and scheduled for delivery in 2019.

10 elevators in total

  • 4 elevators, 1950 kg load, 14 stations
  • 6 elevators, 1850 kg load, 14 stations

 

NEW PROJECT - UKSH CAMPUS, Lübeck, GERMANY

Assembly managing and installation, 2017-2018

Simplex is part of the multi-year plan of reconstruction and construction of one of the largest medical centers in Europe. The project of the Schleswig-Holstein University Hospital was made by joining the Kiel and Lübeck hospitals. In the project of building a new university hospital in Lübeck, a total of 13 elevators capacity from 10 to 33 people will be installed. The 135,000 sqm facility 'will be completed in 2021. Schleswig-Holstein, the northern German federal province invests 1.7 billion euros in Lubeck and Kiel hospitals. 

13 elevators in total

  • 2 elevators, speed 1 m/s, load 800 kg, 10 persons, 3 stations, 11 m
  • 1 elevator, speed 1 m/s, load 1600 kg, 24 persons, 3 stations, 15 m
  • 3 elevators, speed 1,6 m/s, load 1800 kg, 24 persons, 6 stations, 26 m
  • 2 elevators, speed 1,6 m/s, load 2500 kg, 33 persons, 6 stations, 21 m
  • 3 elevators, speed 1,6 m/s, load 2500 kg, 33 persons, 7 stations, 25 m
  • 1 elevator, speed 1,6 m/s, load 2500 kg, 33 persons, 6 stations, 29 m
  • 1 elevator, speed 1 m/s, load 4600 kg, 46 persons, 6 stations, 21 m

 

NEW PROJECT - UKSH CAMPUS, KIEL, GERMANY

Assembly managing and installation, 2017-2018

As part of the large German project to build two new facilities at the Schleswig-Holstein University Hospital in Lübeck and Kiel, Simple xparticipates by installing elevators. In Kiel there are a total of 13 elevators with a range of 2 to 8 stations, with a single capacity of 4600 kg and adapted for transport 61 people. Renovation of the center in Kiel will include restoration of existing medical and research buildings, preservation of the historic buildings of the campus and the construction of a new main entrance. This will centralize 21 separate clinics into a unique 1.3 million square meter large facility.

13 elevators in total

  • 2 elevators, speed 1 m/s, load 800 kg, 10 persons, 2 stations, 8 m
  • 3 elevators, speed 1,6 m/s, load 1800 kg, 22 persons, 7 stations, 23 m
  • 1 elevator, speed 1 m/s, load 1800 kg, 22 persons, 2 stations, 4 m
  • 3 elevators, speed 1,6 m/s, load 2500 kg, 33 persons, 7 stations, 23 m
  • 1 elevator, speed 1,6 m/s, load 2500 kg, 33 persons, 8 stations, 26 m
  • 1 elevator, speed 1,6 m/s, load 2500 kg, 33 persons, 4 stations, 10 m
  • 1 elevator, speed 1,6 m/s, load 2500 kg, 33 persons, 5 stations, 12 m
  • 1 elevator, speed 1 m/s, load 4600 kg, 61 persons, 7 stations, 23 m

 

NEW PROJECT - LIME STREET 52, LONDON, UK

Assembly managing and installation, 2016-2018

In London's business skyscraper, Simplex runs the elevator installation project of 10 elevators from 14 to 39 stations. 52 Lime Street, known as "Scalpel", is a new 36-floor building that will provide 37,000 sqm of business space, shopping center and restaurants. The skyscraper is 190 meters high, designers say, a reminder of the rich history of trade and finance, but also a symbol of a successful, financial future of London.

10 elevators in total

  • 3 highrise TWIN elevators, speed 4 m/s, load 1600 kg, 15 stations, 142 m
  • 1 fire-fighting elevator, speed 3,0 m/s, load 1000 kg, 39 stations, 142 m
  • 2 midrise TWIN elevators, speed 2,5 m/s, load 1600 kg, 14 stations, 99 m
  • 4 lowrise TWIN elevators, speed 2,5 m/s, load 1600 kg, 14 stations, 52 m

 

 

NEW PROJECT - 1 BANK STREET, LONDON, UK

Assembly managing and installation, 2017-2018

New Simplex project in the center of London. We are installing 4 "Mid-Rise" and 2 "Shuttle" elevators in one of the tallest business buildings in the 62-storey British capital, with a height of 278 meters, which also has the top two lifts in Europe. After the construction and completion of the project, it will be the second tallest skyscraper in London with a work space of 12,000 people. The specialty of this facility will be the installation of the first "climbing window" in the world where adventurous adrenaline fans will be able to climb into the skyscraper wall, 125 meters above ground, the project being developed by AXA IM Real Assets and Lipton Rogers Developments.

23 elevators in total:

  • 8 "mid-rise" elevators, load 1800 kg, speed 3.5 m/s, 12 stations, height 96 m,
  • 8 "high-rise" elevators, load 1800 kg, speed 5 m/s, 11 stations, height 128 m,
  • 2 cargo elevators, load 3000 kg, speed 3.5 m/s, 31 station, height 149 m,
  • 3 "low-rise" elevators, load 1800 kg, speed 2.5 m/s, 9 stations, height 47 m,
  • 1 "low-rise" elevator, load 1800 kg, speed 2.5 m/s, 11 stations, height 56 m,
  • 1 "low-rise" elevator, load 1800 kg, speed 2.5 m/s, 31 stations, height 149 m

 

EU Project

 

 

Name of project:                     Elevators without borders

Total value of project:           16.070.555,00 HRK

Total acceptable costs:         12.856.444,00 HRK

Non-refundable:                      5.954.616,05 HRK

Project timeline:                   15.05.2017.-15.05.2018.

Project manager:                   Siniša Stanić

Project coordinator and contact person:  Danijel Kušljić,  danijel.kusljic@simplex.hr

 

Project description:

 

With project ˝Elevators without borders˝ family company Simplex, will contribute to strengthening the industry's competetiveness in the installation and production of elevators on domestic and international markets.

The purpose of project is to increase the company's competetiveness by expandind its existing capacity and diversifying production of elevator componenets and its own elevators.

This project is of utmost importance to the company as it will be able to meet the demand for products that is considerably higher than the existing production capacity. Existing buyers expressed interest in a much larger quantity of products than existing, which the company is not currently able to produce and deliver, and there is a risk of losing market share.

One of the prerequisites for further growth is diversification of products, not just an increase in the quantity of existing product groups. This requirement requires the rounding of the production cycle and the delivery of the final product for the buyers - lifts, which will be realize with this project. Of the current company machines, 50% is outdated and does not meet the default quality levels. In order to produce the products according to the required characteristics and requirements, each of the semi-finished products should be in the tolerance values of the project, and this half of the machines can’t achieve it. Problems of insufficient technological equipment and capacity that lead to unsatisfactory quality levels, insufficient quantities of existing products and the lack of individual products in the product range of enterprises preclude the growth of production and thereby increase sales revenue and export revenues.

Investing in new machines and equipment will bring not only the expansion of production capacities but also the raising of the degree of technological equipment in terms of increasing the quality of material processing, the efficiency of production processes, the shortening of the time required for the entire production process, and the respect of defined delivery terms by reducing the time and cost of production. This investment will reorganize the existing production processes and initiate the production of new product groups, resulting in the introduction into production of 6 new product groups and by completing the production cycle.

In order to increase the presence and recognition of the company Simplex on the domestic and international market, there are planned investments in promotional activities and participation in two international fairs, where besides the existing ones, new products will be introduced.

Given the expansion of existing capacities and diversification of products and the introduction of new technologies, it is necessary to improve the employees who continually monitor the development of the company and with its innovative approach to move the boundaries in assembly and production of elevators in the international market.

Expanding the capacity, diversifying the production of a business unit and enhancing the technological level, increasing employee competences in the elevator manufacturing segment and increasing the company's presence and recognizable on the international market will increase the company's competitiveness.

Ultimately, the realization of the project will enable the company to retain existing jobs and further recruitment of 20 employees, a 23% increase in sales revenue and 22% increase in revenues compared to the base year 2015. Above mentioned indicators show the economic and social impact in the Republic of Croatia.

 

 

 

More information at:

www.strukturnifondovi.hr

http://www.strukturnifondovi.hr/op-konkurentnost-i-kohezija-2014-2020-779

 

The content of the website is the sole responsibility of Simplex d.o.o.